11/24/2023 0 Comments Parkitect wikiThe Suspended Coaster should be adjusted to allow the fitting of a 2nd train by adjusting its brakerun just before the station to include a block brake, as well.Īt this point, the rest of the available money should be spent on building flat rides along the path that the guests have access to.Īs the park progresses, continue adding more flat rides around the park, progressively expanding to the areas around the lake that were previously blocked off. Therefore, consider adding a midcourse brake run somewhere along the middle of the tracks to double their potential throughput and therefore potential revenue (For more details, see the Block Sections Guide). This, while not insignificant, isn't going to improve the profitability of the coasters that much. They can currently support two trains, however the way their block sections have been set up are such that almost the entirety of the track is a single block, meaning that all the addition of the 2nd train will do is speed up the loading times. Once issue #1 & 4 have been addressed, consider looking at the duelling Steel Coasters. Researching coasters is typically not necessary, as the three starting coasters in conjunction with the available Floorless Coaster will be enough to satisfy the park goals, coaster-wise. Once both a food and a drink stall has been obtained, switch back to researching other rides. By doing so, this part of the park can be handled by the park staff at a later time while they deal with the more pressing areas of the park, e.g the areas leading to the coasters.įor research, immediately change research focus to shops & stalls to fix issue #4. If the area to the right of the park entrance was blocked off, consider initially blocking it off for the handymen and mechanics as well. To fix issue #1, hire handymen and mechanics, however do take note that guests will keep vandalizing repaired path attachments if they walk around very dirtied paths. As the park is expanded later on, this area can progressively be opened up to allow more rides to be placed down. Simultaneously, block the two paths leading to this area of the park using signs so that guests are not exposed to this area of the park, leaving a straight path from the entrance to the duelling steel coasters available for the guests. Do not reopen the railway until rides have been built all around the lake. It serves little purpose until the area to the right of the park entrance (Issue #3) has been populated with attractions. To start off with, it is recommended to close the miniature railway attraction. Adjusting of coaster layouts to improve throughput.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |